top of page
Search


The Slot Record Is Still a Claim Until Someone Checks It
A live order does not fail at the carrier cut-off. It fails earlier, when a picker reaches a location the system said was full and finds it empty, or finds the wrong SKU. By then the wave is already late, and the recovery is a manual exception. In most buildings nothing tells the operator that ahead of time. The warehouse management system shows an expected on-hand quantity and a location. Both are claims until a person verifies them. The cost of that gap is already measured

Susan Cohen
4 days ago


Industry Roundup: The Moves That Set The Floor
This month: Total Interiors Direct, Interroll, Sentric Safety Group, Hyster, Briggs Equipment, Nuvera, Forth Ports, Lucas Systems, Hai Robotics, BEUMER Group, Calzedonia Group, KNAPP, Skechers, Geek+, Jungheinrich, Crown, TGW Logistics, Swisslog, Nowaste Logistics, AutoStore, Infios, Logistik Schmitt, Infor, AR Racking, RediRack, John Scott Works, Exporta, Cimcorp, Nulogy, Kuehne+Nagel, Toyota Material Handling, Exotec, First Supply, Stadium, Slättö, Dematic, Würth, Movu Robo

Susan Cohen
Oct 8


Importers Push Beyond Visibility as Port-to-Warehouse Delays Continue to Drive Costs
A container reaches the port on time. The vessel delay everyone feared never happens. Yet the shipment still fails to reach the warehouse as planned. The receiving slot changes. The drayage carrier cannot secure a new appointment. Warehouse teams are already committed to other inbound loads. What begins as a scheduling adjustment quickly develops into detention charges, missed labour plans and inventory delays. For many importers, some of the most expensive disruptions now oc

Susan Cohen
Jul 26
bottom of page

